.

Thursday, June 20, 2019

FAULT DIAGNOSIS OF AC High Voltages UNDERGROUND CABLES AND SOLUTIONS Research Paper

FAULT DIAGNOSIS OF AC High Voltages UNDERGROUND CABLES AND SOLUTIONS ANALYSIS TECHNIQUES - Research Paper ExampleI similarly looked at the formation of urine trees in the plastic separation and how both mechanical and chemical forces trigger them. Besides, charges can also lead to the formation of water trees. After a thorough analysis of prison-breaking detection techniques, I settled on two of them. They first one is the magnetic amorphous magnetoelectric machineresistive concentricneutral probing. The next method is the radio frequency test point injection. The magnetic technique can detect a fault from an average distance of 90 feet.Underground cables have been in use for a long time in power distribution networks due to the advantages associated with subway connections. These cables are friendly to the environment, are not interrupted by adverse weather conditions, are less expensive for shorter distances and have got low maintenance costs. The disadvantages of these cables are that they are more expensive than overhead lines, have low power transferring capacity, are likely to get permanently damaged and fault localization in undercover cables is also difficult.Faults in underground cables are divided into two general groups that are permanent and incipient faults. Incipient faults develop from aging of insulation material that can be caused by chemical pollution, electrical overstress, severe environmental conditions and mechanical factors. Incipient faults gradually turn into permanent faults.Fault location is important in ensuring that distribution networks remain reliable as the restoration allow for be quick, so that power outage time is reduced. The cost of repair will also be low if a fault is located and corrected promptly.This research majorly studies how faults can be diagnosed in AC high voltage underground cables and the possible solution techniques for the faults. Some objectives must be achieved to realize this goal. The first object ive is to establish the distinction between underground

No comments:

Post a Comment